Construction preparation
Technical preparation: The drawings have passed the joint review, and the positions and dimensions of the door and window openings are consistent with the construction drawings. Technical disclosure work has been carried out according to the construction requirements.
Material preparation: The material variety, type, specification, size, opening direction, installation position, and anti-corrosion treatment of the sliding door should meet the design requirements. Main accessories and materials: various hardware such as edge strips, grooves, pulleys, etc. must meet the design requirements.
Working conditions: Before installation, check whether the door frame and leaf have any warping, peeling paint, hard damage, etc. If there are any, they should be treated.
construction technology
Installation of edge strips: After the main structure is completed and accepted, check the size of the hole and measure it at three points, with the smallest point as the standard. According to the installation elevation of the door frame, draw a+50cm position line on the door frame to facilitate the correction of the door frame's levelness during installation. Use a plumb line to calibrate the verticality of the frame's front and side, and use a spirit level to calibrate the levelness of the protruding head.
Installation of finished door: Install the finished door and test whether the push is smooth. If the effect is not good, you can adjust the bottom pulley of the sliding door to make it slide freely